Roads

Two treatments, two different clocks, and what happens when a board skips either one.

Asphalt roads need two separate treatments on two separate clocks: sealcoating roughly every two to three years, and crack sealing starting two to five years after paving and repeating about every two years through year ten. Skip either one and water gets into the base, turning a low-cost seal into a full resurfacing or reconstruction.

01

Two treatments, two different clocks

Sealcoating and crack sealing look similar from the curb, but they do different jobs and start on different schedules. Sealcoating protects the surface from water and UV damage and is generally repeated every two to three years on typical community roads, closer to every one to two years on higher-traffic surfaces like a clubhouse lot or main entrance drive. Crack sealing addresses individual cracks as they open, typically beginning two to five years after paving and repeating on a roughly two-year cycle through years five to ten.

Put both on the maintenance schedule as separate line items with separate trigger dates. Treating them as one job, or waiting for one to remind you of the other, is how a crack that should have cost a few dollars to seal turns into a section of failed base.

02

Deferred road maintenance turns cheap into expensive

Skipping a sealcoat or crack-seal cycle does not erase the cost, it defers it. APPA, the association for facilities professionals, defines deferred maintenance as work that should have happened and did not.

"Preventive, predictive, or corrective maintenance that assets and systems should have undergone but have not yet done so."

Source: Deferred Capital Renewal and Deferred Maintenance, APPA

For a road, that means water finds its way through an unsealed crack into the base layer, and what would have been a routine, budgeted seal becomes a resurfacing or reconstruction project, often funded by a special assessment. APPA links deferred maintenance to fiscal instability and safety liability, not just higher future cost, which is why the board should treat a skipped sealcoat cycle as more than a line item to push to next year.

03

Roads and the reserve study

Whether roads show up as their own reserve study line item, and who is responsible for maintaining them at all, depends on the association's governing documents and how the roads were originally dedicated. Check your CC&Rs and any deed of dedication to confirm whether your association or a municipality owns and maintains the roads.

When roads are the association's responsibility, they typically qualify for the reserve study because they have a predictable remaining useful life and a replacement cost above the association's set threshold. A maintenance log is not a substitute for that: the log records what work was completed, while the reserve study's condition assessment periodically re-rates what condition and life remain.

Check yourself

Answer before you read the explanation, recalling it is what makes it stick.

Your community's roads were paved three years ago. A contractor spots hairline cracks and recommends crack sealing rather than a full sealcoat. What should the board do?

The board postpones sealcoating for six straight years to save money. What is it most likely creating, according to APPA's framework for deferred maintenance?

A board member argues the roads do not need to be in the reserve study because 'we already keep a maintenance log for them.' Why is this wrong?

Related elsewhere in the Academy

Maintenance Fundamentals

Sealcoat and crack-seal cycles vary by climate, traffic, and pavement condition, and whether your association or a municipality owns and maintains the roads depends on your governing documents and any deed of dedication.